28screening of excavated material scope of work

Home - 28screening of excavated material scope of work

  • Grading and Excavating Contractor Responsibilities | Work ...

    Although excavation regulations vary by state, these contractors typically submit applications describing the scope of the project to a regulatory agency for approval. When an agency needs to inspect the excavation site, the grading and excavating contractor usually is present to answer any questions the inspector might have.

  • MANUAL OF PROCEDURES FOR EARTHWORK

    random material. Associated items of work considered to be in the broad range of earthwork include clearing and grubbing, removal of trees and stumps, scalping, removal of structures and obstructions, channel excavation, preparation of foundations for embankment, disposal of excavated material, borrow, preparation of

  • Excavation Safety Work Method Statement and Procedure

    Oct 24, 2018· The scope of this document covers: Safe work method and procedure for carrying open excavation works; Materials, equipment, and tools needed to carry out the excavation activity; Applicable standards throughout the execution of the project; Standards for excavation safety. OSHA 2226-10R 2015: Trenching and Excavation Safety (download PDF)

  • SCOPE OF WORK MASONRY KINGSWAY PROJECT 1.1

    SCOPE OF WORK MASONRY KINGSWAY PROJECT 1.1 GENERAL A. WORK The term Work includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents. The CONTRACTOR is only to use its own forces and/or OWNER/CONSTRUCTION MANAGER approved sub-trades to undertake the Work.

  • ATTACHMENT # 1 SCOPE OF WORK CONSTRUCTION OF

    2. The Contractor shall cut level and remove excavated material. The Contractor shall dispose of excavated material. B. NEW WORK 1. The Contractor shall construct a reinforced concrete slab of 6.70 meters (22 feet) long by 3.04 meters (10 feet) wide by 0.15 meter (6

  • CHAPTER 2 EARTHWORK 2.1 SCOPE: 2.2 GENERAL

    2.1 SCOPE: Earthwork shall consist of all necessary site clearing and grubbing, excavation and backfill for structures and trenches, site grading, grassing and restoration, as well as related work as shown on the plans and as specified herein. 2.2 GENERAL:

  • SECTION 2 EARTHWORKS - UNDP Procurement

    2.1 Scope of Work This section covers trenching and backfilling work and shall include the necessary clearing, grubbing and preparation of the site; removal and disposal of all debris; excavation and trenching as required; the handling, storage, transportation and disposal of all excavated material; all

  • Section 3-03 Earthwork Design

    transport the material to its desired locati on, the amount of material to be excavated, etc., are collectively known as the earthwork process. The basic elements of the earth grade portion of the roadway cross section are shown in Exhibit 1. Excavation (cut): In-place material that is removed to achieve the desired earth grade cross section.

  • TECHNICAL SPECIFICATIONS FOR SEWERAGE SYSTEMS

    Technical Specifications for Sewerage Systems 5 2.4 Excavation a) The Contractor shall perform all excavation true to lines, widths and depths shown on the Drawings or to such further lines, depths or dimensions as may be directed by the Engineer. b) Excavation work will be classified according to the quality of the material to be excavated. In three classes as

  • General Construction Scope Of Work - BidNet

    1.2 SCOPE OF WORK A. General Scope of Work: 1. The Contractor shall receive, protect, store, haul, assemble, erect, install, test and place into service and associated foundations materials defined by this document and associated specifications and drawings. B. Structural Scope of Work: 1. Subsoil preparation. 2. Excavation and backfilling.

  • SECTION 6 INDEX

    1. SCOPE OF WORK This work shall include the furnishing of all labor, materials, and equipment necessary for the clearance, excavating, trenching and backfilling, all pipe lines constructed on this Project, the continual drainage of excavation, sheeting, bracing and

  • Scope of Work Provisions

    shall work under the supervision of a state ce1tified electrician. Duties shall consist of: distribution of material at job site, the pulling of interconnect, detector loops, fiber optic cable and CCTV cable. Transportation Technician can also be used for [REDACTED] manual excavation and backfill of all trenching and excavation.

  • STANDARD SPECIFICATIONS FOR PUBLIC WORKS

    Oct 03, 2005· 509.1 Scope of Work 509.2 Grade 509.3 Staking 509.4 Jointing 509.5 Expansion Joints 509.5.1 Basis of Payment 509.6 Excavation and Fill Areas 509.6.1 Method of Measurement 509.6.2 Basis of Payment 509.7 Base Material 509.7.1 Basis of

  • SCOPE OF WORK - City of Harrington

    plates, pipes, concrete slabsbricks and all foreign materials encountered during excavation for , stone, contract items. Scope of Work SCOPE-2 10. Topsoil, Fertilizing, and seeding of all disturbed grassed areas. ADDITIONAL REQUIREMENTS . 1. All work by the Contractor must be complete within the specified calendar day time limit. ...

  • STANDARD CONSTRUCTION SPECIFICATIONS FOR

    Article 1.1 Scope of Work The Work covered by this Division consists of providing all plant, labor, equipment, supplies, material, transportation, handling, and storage, and performing all operations pertaining to the: 1) construction of subbase for

  • Method Of Statement For Excavation Compaction & Back ...

    Mar 16, 2021· SCOPE OF WORK: Method Statement for Excavation Compaction and Back-filling. This procedure is issued to describe the work processes involved in construction of the excavation of concrete structure foundations, and other facilities for (Project Name) at (City Name). The latest revision of the PROJECT specifications shall be used as references ...

  • Excavation, Backfill & Compaction within the Swamp Area ...

    Weight of dump truck containing the excavated material will not be exceeded the limited weight allowed by the nation, local, traffic law. Prior to relocating/transportation of excavated material to the designated dumping area a work permit by Eastern Industrial Estate shall be obtained on the day when transportation is to be done.

  • SCOPE OF WORK - City of Columbus

    scope of work the contractor shall fully comply with the city of columbus ada rules and regulations and the city of columbus construction and material specifications, current edition. this work shall consist of pavement removal, necessary excavation, and pavement replacement in accordance with the details shown herein. all work and materials shall

  • GENERAL CONSTRUCTION SERVICES U. S. CONSULATE

    The work shall be executed in a diligent and workmanlike manner in accordance with the negotiated fixed-price, this Scope of Work, the Project Schedule, International Building Codes, and the laws of the City of Erbil where applicable. 4. Work Hours. Unless otherwise agreed with the COR, the work shall be executed during normal Consulate work hours.

  • 312333 Trench Excavation and Backfill rev 6-23-05

    SECTION 312333 TRENCH EXCAVATION AND BACKFILL Scope: The work under this Section consists of furnishing all labor, equipment and materials and performing all ... and kept separate from general excavated materials and shall be replaced at the surface of the trench in back filling. In lieu of removing and replacing sod, the

  • BID PACKAGE SPECIFICATIONS - Mass.Gov

    Jan 17, 2019· 3.0 SCOPE OF WORK DESCRIPTION . A. The Scope of Work shall consist of the furnishing of all labor, materials, equipment, services, permits, and agreements necessary to approximately 425 feet of an existing thoroughly clean sanitary sewer line at the Site.

  • SCOPE OF SERVICES FOR SURVEYING SERVICES I.

    II. SCOPE OF WORK Consultants will perform engineering and related services for CPRA projects on an as needed, Task Order basis. Consultants will be required to execute a Task Order which will specify the scope of services, task schedule, and compensation. Each Task Order will become a part of the

  • CHRISTCHURCH CITY COUNCIL CONSTRUCTION STANDARD ...

    7.3. Measurement of Work and Basis of Payment Excavation shall include sawcutting and excavating to the required depth and width, trench support where necessary, removal and suitable disposal of excavated material from site, and all costs incidental to the work. Excavation shall be included in the rate for the relevant scheduled item. 8 ...

  • BUILDING SCOPE OF WORK - bidroom

    BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, etc, (unless noted otherwise) to complete all sections of the Building Construction Scope of Work covered by this Request for Proposal and any subsequent Purchase Order and Contract. 2.

  • Scope of Work and Schedule, Cleanup Action Plan

    Construction Work Requirements. Contaminated materials from the former manufactured gas operations are anticipated to be visually identifiable. Once overburden soils are excavated to the top of waste, all material below the top of waste will be considered contaminated unless demonstrated otherwise. 2

  • APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT

    SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS E- 2 2.7. The Contractor shall conduct the work so as not to interfere with the disaster response and recovery activities of Federal, State, tribal and local governments or

  • Estimate for Excavation, Pier Drilling, Foundation ...

    Mar 18, 2014· Scope of Work Basement/Foundation Plan Mobilize to jobsite & supervision. ... (Hard rock excavation is defined as material that requires the use of pneumatically, hydraulically or 35 pound and over electrically operated hammers or rams to excavate.) (Hard rock drilling is defined as a penetration rate slower than 1 ft. in 5 minutes.)

  • DRYWALL FINISH SPECIFICATIONS

    EXCAVATION SPECIFICATIONS Contractor to furnish and install all labor, materials, equipment and consumables to complete the following scope of work as listed below: 1. Furnish and install orange safety fence around each excavation. Safety fence to be a minimum of 4 high and must be constructed to completely enclose the entire excavation

  • University of Houston Master Construction Specifications ...

    1.1 SCOPE OF WORK . A. This Section pertains to the earthwork generally consisting of excavation, filling, backfilling and subgrade preparation as required for construction of site retaining walls/structures, slab on grade walks, pavement surfaces, landscaped areas and the general shaping of the site as

  • Cultural Resources Master Scope of Work Template

    Jul 17, 2018· The results of the geomorphological assessment should be coordinated with the scope of work for the field survey. Task 4: Tribal Coordination Due Date: [date] Responsibility for formal consultation with tribes in matters of the Section 106 review process is a government-to-government function that cannot be delegated by WSDOT to a consultant.

  • STANDARD SPECIFICATIONS FOR PUBLIC WORKS

    Oct 03, 2005· 509.1 Scope of Work 509.2 Grade 509.3 Staking 509.4 Jointing 509.5 Expansion Joints 509.5.1 Basis of Payment 509.6 Excavation and Fill Areas 509.6.1 Method of Measurement 509.6.2 Basis of Payment 509.7 Base Material 509.7.1 Basis of Payment 509.8 Curb Ramps 509.9 Sidewalk Vaults

  • Work Procedure of Excavation at Construction Site

    Work procedure for excavation at construction site involves understanding of centre line and excavation drawings, setting out of plan on ground, excavation of soil and removal of excess soil. Quality checks such as recording ground level and marking of reference points should be done. Excavation is the process of moving earth, rock or other ...

  • DIVISION 2 - 02200 Excavation, Grading, and Backfill

    1.1 WORK A. Provide all related materials, equipment, and labor required to complete the work specified. B. All excavation, trenching, compaction, backfill, and landscaping shall be as listed in the Scope and as specified herein. 1.2 QUALITY OF WORK A. Provide experienced, well-trained workers competent to complete the work as specified. B.

  • STANDARD SPECIFICATIONS FOR PUBLIC WORKS

    Oct 03, 2005· WSWS 1.3.0 Control Of Work And Materials WSWS 1.3.2 Authority and Duties of Inspectors WSWS 1.3.14 Final Acceptance WSWS 1.5.0 Scope Of Work And Specific Instructions WSWS 1.5.6 Guarantee WSWS 1.5.7 Items Not Listed In Estimate of Quantities WSWS 1.7.0 Protection Of Work - Public And Private

  • Guidelines for Phase I, II, and III Archaeological ...

    The completion of Guidelines for Phase I, II, and III Archaeological Investigations and Technical Report Preparation is due in large part to the efforts of two former Historic Preservation Office archaeologists. Development of the guidelines was initiated by Eric Voigt, author of the original WVSHPO survey and curation regulations.

  • SCOPE OF WORK: TECHNICAL SPECIFICATIONS AND

    Work is anticipated to involve contact with refuse and landfill gas. The work of this contract includes excavation of refuse or contact with refuse. Other work is in the vicinity of buried garbage and other materials in the sanitary landfills. Potential hazards exist due to the presence of these buried materials,

  • Method Statement for Excavation Works

    Jan 22, 2014· 5.2.3 All excavated material shall be kept a minimum of 1.0 meter from the edge of excavation or shall be stockpiled to the area designated by the Engineer. 5.2.4 For all excavation activities, adequate safety barriers, signboards, advance warning signs would be used. 5.2.5 For foundation, as soon as the excavation reaches the required depth ...

  • Public Notice - U.S. Army

    May 23, 2014· The scope of work for the LOP-2 is limited to discharges of dredged or fill material associated with excavation activities in waters of the United States, including navigable waters of the United States. Activities that may be authorized by

  • SECTION 31 32 13.19 - LIME STABILIZATION 1.1 SCOPE OF

    1.1 SCOPE OF WORK . A. This Section specifies the requirements for treating and stabilizing existing subgrade material or select fill material under pavements or structures as shown on the drawings, by site pulverizing, adding lime, and finishing to the lines and grades shown on the drawings and constructed as specified herein. B.

  • Work Health and Safety (Excavation Work) Code of Practice 2015

    Mar 30, 2016· This Code of Practice for managing health and safety risks associated with excavation work is an approved code of practice under section 274 of the Work Health and Safety Act (the WHS Act).. An approved code of practice is a practical guide to achieving the standards of health, safety and welfare required under the WHS Act and the Work Health and

  • SCOPE OF WORK EXCAVATION & SHORING ALDER STREET

    SCOPE OF WORK EXCAVATION & SHORING ALDER STREET PROJECT 1.1 GENERAL A. WORK The term Work includes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents.

  • Various Types of Excavation Equipment Use on Construction Site

    The types of excavation equipment to be used in an excavation project depend on the scope of work and construction site. The excavation equipment to be used can either be utilised for some situations or can be a particular type which meets the requirements of the given project. The various types of excavation equipment used in building projects ...